48215_Materials&Assembly
Concrete Framing Homework (15 pts)
Due Date: 2007.04.10 (since I was late posting this, you can be late turning it in w/o penalty)
Assignment
Each of you has obtained enough water, Portland cement, flyash, sand and gravel to mix 50 cubic yards of concrete slab. Design one rectangular, site cast concrete, two story structure and one rectangular, precast concrete, two story structure. Both schemes should utilize all of the concrete with no waste for the slabs, while you are allowed to add concrete for the girders, beams, joists and columns.
Using the analog drawing conventions introduced in class, compose a set of drawings on ANSI "B" (11" x 17") sheets containing the following drawings with all framing members, room labels, section marks, notes, dimensions and grid lines.
Please submit your drawings to the designated space in the entrance of the Robert L. Preger Intelligent Workplace™.
Use the depth to span ratios from the class handout.
Configuration Table
Last Digit SS # | Aspect Ratio |
4, 7 | 1:1 |
6, 9 | 2:3 |
8, 1 | 1:2 |
0, 3 | 1:3 |
2, 5 | 1:4 |
Note: some aspect ratios will result in more than 1 structural bay |
Grading Criteria:
Grids/ Dimensions/ Notes | 3 pts |
Primary/ Secondary Span | 3 pts |
Configuration | 6 pts |
Details | 3 pts |