The old garage roof has been removed to the degree that real construction can start (see section). The wider spacing between joists on the left results from the removal of the joist inbetween--it's the gap through which eventually the stairs to the 2nd-floor study will rise. Time to pull a permit. |
|
Last change made to this page: August 1, 2008 |